Construction · Fire service installations · Hong Kong
Inspection quotations and certificate data for a Hong Kong fire services contractor
Twelve hundred sites, two price schedules, one checklist from the technician — and the paperwork now follows from it.
Representative example — a composite of typical Hong Kong workflows, written from the duties in current job ads. Company names, documents and figures are sample data.
A registered fire service installation contractor in Hong Kong carries out annual inspections and repairs for about 1,200 buildings, shops and restaurants. After each annual inspection the registered contractor issues a certificate called FS251, and a copy goes to the Fire Services Department. Each job needs a quotation, an invoice and that certificate — and all three depend on the same device count.
At a glance
The files they already use
- Technician's inspection checklist
- Site photos from the technician
- Price list by device type
- Client list with price schedule
- Last year's certificate
- Unit price × device count, per device type
- Property-management or single-shop schedule
- Minimum charge per visit
- After-hours surcharge on labour only
- Failed items become a remedial quotation
Done automatically
- Inspection quotation
- Invoice
- FS251 certificate data — for signing
- Remedial-works quotation — drafted
The registered contractor checks and signs every certificate; a person sends every quotation and invoice.
How they used to do it
After each inspection, the technician filled in an Excel checklist on site and sent photos by WhatsApp. Back at the office, the clerk counted the devices on the checklist, looked up whether the client was on the property-management schedule or the single-shop schedule, and typed a quotation in Word — remembering the minimum charge and, for shops inspected after closing, the after-hours surcharge.
Once the job was confirmed, the same figures were typed again into the invoice, and a third time into the certificate data for the registered contractor to check and sign. Failed items were circled on the checklist; a remedial quotation was written only if someone remembered to follow them up.
The difficulties
- Wrong price schedule. A single shop was sometimes quoted at the lower property-management rates, and the difference was only noticed at year-end.
- Surcharge on the whole bill. The after-hours surcharge is meant for labour only, but it was sometimes added to the device charges too — and the client queried the invoice.
- Minimum charge forgotten. Small shops with only a few devices were quoted below the minimum charge per visit, so the visit cost more than it earned.
- Counts copied from last year. Under time pressure, device counts were copied from last year's certificate instead of this year's checklist.
- Defects left behind. A failed item has to be recorded on the certificate data as an outstanding defect, but the remedial quotation depended on someone's memory.
Their formula, broken down
An inspection quotation looks simple: count the devices and multiply. Behind it are four rules, and each one is easy to get wrong. Here is the annual inspection of a restaurant, Restaurant B, which can only be inspected after closing time.
Price each device type
The restaurant is a single shop, so the single-shop schedule applies: 18 smoke detectors at HK$45, 64 sprinkler heads at HK$12, 6 fire extinguishers at HK$30, 2 hose reels at HK$120 and 8 exit signs at HK$25.
detectors HK$810 + sprinklers HK$768 + extinguishers HK$180 + hose reels HK$240 + exit signs HK$200HK$2,198
Apply the minimum charge
Device charges are never below HK$2,500 per visit. HK$2,198 is below it, so the difference is added.
minimum HK$2,500 − devices HK$2,198+HK$302
Add the technicians' labour
Two technicians for three hours, at HK$280 an hour each.
2 technicians × 3 hours × HK$280+HK$1,680
Add the after-hours surcharge — on labour only
The inspection is after closing time, so labour is charged 50% more. The surcharge is not applied to the device charges.
labour HK$1,680 × 50%+HK$840
What the system produces
What the technician recorded on site
| Device | Last year | This year | Result |
|---|---|---|---|
| Smoke detectors | 18 | 18 | Pass |
| Sprinkler heads | 60 | 64 | Pass — count changed |
| Fire extinguishers | 6 | 6 | 1 failed: low pressure |
| Hose reels | 2 | 2 | Pass |
| Exit signs | 8 | 8 | Pass |
| Devices inspected | 98 | ||
Annual inspection quotation
| Item | Basis | HK$ |
|---|---|---|
| Device charges | 98 devices, single-shop schedule | 2,198 |
| Minimum charge top-up | Minimum HK$2,500 per visit | 302 |
| Technician labour | 2 technicians × 3 hours × HK$280 | 1,680 |
| After-hours surcharge | 50% of labour HK$1,680 only | 840 |
| Quotation total | 5,020 | |
How it was calculated
Quotation = device charges (topped up to the minimum) + labour + surcharge on labour
= HK$2,500 + HK$1,680 + HK$840 = HK$5,020
Flagged for a person to confirm
- Sprinkler heads: 64 this year, 60 last year — the technician is asked to confirm, with the site photos attached, before the count goes on the certificate.
- One fire extinguisher failed. It is recorded on the certificate data as an outstanding defect, and a remedial quotation to replace it (1 × HK$420 = HK$420) is drafted for a person to send; the registered contractor checks and signs the certificate.
In this example: the quotation uses the right schedule, the minimum charge is applied, the surcharge touches labour only, and the failed extinguisher is recorded as an outstanding defect with a drafted remedial quotation instead of being forgotten.
How we helped
We build one record per site — the client's price schedule, last year's device counts and every certificate — and a system that reads the technician's normal checklist and prepares the quotation, the invoice, the certificate data and any remedial quotation. The technicians change nothing about how they record; the office stops retyping and starts checking.
- The checklist comes in. Technicians keep filling in the same Excel checklist and sending photos; the system reads the count and result for every device type.
- Checked against last year. Every count is compared with last year's certificate, and every client with its price schedule. A changed count, a failed item or a missing schedule is flagged.
- Priced by their own list. Device charges use the right schedule, the minimum charge is applied, and the after-hours surcharge is added to labour only.
- Checked, then signed or sent. The registered contractor checks and signs the certificate; a person sends the quotation, the invoice and any remedial quotation.
What the system handles
Inspection quotations
Priced per device type from the contractor's own list, with separate schedules for property-management clients and single shops.
Invoices
Issued from the confirmed quotation, so the figures are never typed twice.
Certificate data
The FS251 details are prepared from this year's checklist for the registered contractor to check and sign; Alveek never issues or signs a certificate.
Remedial works
Every failed item becomes a line on a drafted remedial quotation, priced from the same list.
Renewal list
Sites due for their next annual inspection are listed each month for the office to arrange.
Before and after
| Topic | Before | After |
|---|---|---|
| Device counts | Counts were sometimes copied from last year's certificate. | Counts come from this year's checklist; any change from last year is flagged. |
| Price schedule | The clerk had to remember which clients were on the property-management schedule. | Each client carries its own schedule; a client without one is flagged, never guessed. |
| Surcharge | The after-hours surcharge was sometimes added to the whole bill. | The surcharge is worked out on labour only, every time. |
| Certificates | Certificate details were typed a third time from the checklist. | The certificate data is prepared from the same checklist and waits for the registered contractor to sign. |
| Defects | Failed items were circled on paper and sometimes never quoted. | Every failed item is recorded on the certificate data as an outstanding defect and becomes a drafted remedial quotation. |
How much time it saves
- About 1,200 sites a year means about 100 annual inspections a month, each taking around 2 hours of paperwork: quotation, invoice, certificate data and follow-up.
- 100 inspections × 2 hours = 200 hours a month.
- With the system, each job is checked in about 27 minutes: 100 × 27 minutes = 45 hours.
- Time saved ≈ 155 hours a month — about 19 working days.
- At HK$110 an hour (about HK$19,000 a month for one full-time clerk, MPF included), that is about HK$17,000 a month — before counting remedial work that is no longer forgotten.
These are the working assumptions behind the figure, not an audited result.
How a project like this runs
- Free assessment. We sit with your clerk through a week of inspections and collect a completed checklist, quotation and certificate for each kind of client.
- Built on your own jobs. The price schedules, minimum charge and surcharge rule are rebuilt from your past quotations and tested until they reproduce the issued figures.
- Side by side. For one month your office prepares paperwork by hand while the system runs on the same checklists, and the two are compared line by line.
- Live, then maintained. Once they match, the retyping stops. New clients are added with their price schedule, and we fix anything that comes up.
Questions owners usually ask
- Does the system issue the certificate?
No. The system prepares the certificate data from the checklist. The registered contractor checks it and signs; Alveek never issues or signs a certificate. - What if a client has no price schedule?
The job is flagged and not priced. A person chooses the schedule once, and every later job for that client uses it. - Do our technicians need a new app?
No. They keep the Excel checklist and WhatsApp photos they use today.
The results
- Every quotation is priced from this year's checklist, on the client's own schedule, with the minimum charge and the labour-only surcharge applied.
- Certificate data is ready for the registered contractor to check and sign, with any failed item recorded as an outstanding defect.
- Every failed item turns into a drafted remedial quotation instead of a circle on paper.
Representative example — a composite of typical Hong Kong workflows, written from the duties in current job ads. Company names, documents and figures are sample data.
Related case studies
Also useful: Back-office outsourcing · Try a working demo · Free tools · All case studies
Does your company have a formula like this?
Send us one real example — a quotation, an invoice or a month-end statement — and we will show you how the system would work it out. The assessment is free.
Get a free assessment →