Manufacturing · Labels and stickers · Hong Kong

Quotation and job ticket automation for a Hong Kong label printer

One hundred and sixty quotations a week, each one priced by the same rules — and no job goes to the press before the artwork is approved.

160 hoursestimated time saved a month
Target0job tickets released on unapproved artwork
TargetMinutesfrom enquiry to a quotation draft

Representative example — a composite of typical Hong Kong workflows, written from the duties in current job ads. Company names, documents and figures are sample data.

A label and sticker printer in Kwai Chung quotes about 160 jobs a week for food, cosmetics and logistics customers. Each quotation depends on the label size, the material, the number of colours, whether a cutting die already exists and how soon the customer needs the labels. A slow or wrong quotation loses the job or loses money on it.

At a glance

The files they already use

  • Customer enquiries by email
  • Artwork sent on WhatsApp
  • Material and printing price list
  • Cutting die register
  • Artwork versions and approvals
AI systembuilt around their rules
  • Label area with gaps, plus 10% waste
  • One plate per colour
  • Die charged only if none on file
  • Printing priced by quantity tier
  • Rush surcharge for short delivery

Done automatically

  • Quotation
  • Production job ticket
  • Material and die check
  • Quotation email — drafted

A coordinator checks every quotation and job ticket before it is sent or released.

How they used to do it

Enquiries arrived by email and WhatsApp: a size, a quantity, sometimes a photo of an old label. The order coordinator worked out the label area on a calculator, looked up the material rate and the quantity tier in an Excel price list, and checked a die register to see whether a cutting die of that size was already on the shelf.

Once the customer accepted, the same figures were typed again into a production job ticket, and the roll length was worked out a second time. Artwork went back and forth by email, and the version that reached the press was whichever one the coordinator believed was final.

The difficulties

  • Dies forgotten. A size with no die on file can be quoted as if a die existed, leaving the company to pay the HK$650.00 die itself.
  • Wrong quantity tier. The printing rate was taken from the wrong row of the price list, so large orders were sometimes quoted too high and lost.
  • Printed on old artwork. A job can go to the press on version 2 while the customer has approved version 3, and the whole run then has to be printed again.
  • Typed twice. Every accepted quotation was retyped into a job ticket, and the roll length was worked out again by hand.
  • Slow replies. Quotations were often sent at the end of the day, while customers were comparing prices from several printers.

Their formula, broken down

A label quotation looks like one price. Behind it are five separate charges, and each one follows its own rule. Here is a repeat order for 20,000 self-adhesive labels of 60 × 40 mm on art paper with gloss lamination, in 4 colours, needed in 3 working days.

Their formulaQuotation = material (label area with gaps × quantity + 10% waste, × rate per m²) + plates + die (only if none on file) + printing (by quantity tier) + machine setup, then + rush surcharge
  1. Work out the material

    Each label takes 63 × 43 mm once the gaps between labels are included. 20,000 labels need 54.18 m²; 10% is added for setup waste, giving 59.60 m² at HK$9.50 per m².

    0.063 m × 0.043 m × 20,000 labels × (1 + 10% waste) = 59.60 m² × HK$9.50HK$566.20

  2. Add plates — and the die only if needed

    Each colour needs its own printing plate at HK$180.00. The die register shows die D-118 for this size is already on the shelf, so there is no die charge. A new die would have cost HK$650.00.

    4 colours × HK$180.00 + die HK$0.00HK$720.00

  3. Printing by quantity tier, plus setup

    20,000 labels fall in the 10,001–50,000 tier at HK$0.028 per label. Machine setup is a fixed HK$300.00 per job.

    20,000 labels × HK$0.028 + setup HK$300.00HK$860.00

  4. Add the rush surcharge

    The subtotal is HK$2,146.20. Delivery in 3 working days is a rush job, charged at 15% on top.

    subtotal HK$2,146.20 × 15%+HK$321.93

Quotation totalHK$2,468.13

What the system produces

quotes.alveek.ai/Q-2609-114Sample data

Customer enquiry and job details

Customer enquiry emailPrice list.xlsxDie register.xlsx
ItemDetail
Label size60 × 40 mm
MaterialArt paper, gloss lamination
Colours4
Quantity20,000
Delivery3 working days (rush)
Cutting dieD-118 on file
ArtworkVersion 3 — not yet approved

Quotation Q-2609-114 and job ticket

Q-2609-114.pdfJob ticket JT-2609-114 (on hold)
ItemBasisHK$
Material59.60 m² × HK$9.50566.20
Plates4 colours × HK$180.00720.00
Cutting dieD-118 on file0.00
Printing20,000 labels × HK$0.028 (tier 10,001–50,000)560.00
Machine setupFixed per job300.00
SubtotalHK$566.20 + HK$720.00 + HK$0.00 + HK$560.00 + HK$300.002,146.20
Rush surchargeHK$2,146.20 × 15% for 3 working days321.93
Quotation total2,468.13

How it was calculated

Material = label with gaps × quantity, plus 10% setup waste, × rate per m²

0.063 m × 0.043 m × 20,000 labels = 54.18 m² → + 10% waste = 59.60 m² → × HK$9.50 = HK$566.20

HK$2,146.20 + HK$2,146.20 × 15% = HK$2,146.20 + HK$321.93 = HK$2,468.13

Job ticket: 4 labels across a 252 mm web, 20,000 labels ÷ 4 = 5,000 rows × 43 mm = 215 m, plus 10% waste = 236.5 m of material.

Flagged for a person to confirm

  • Artwork version 3 is not yet approved by the customer — the job ticket is on hold and nothing goes to the press until the approval is on file.
  • The customer asked about 62 × 40 mm for the next order — no die of that size is on file, so a new die (HK$650.00) must be confirmed with the customer first.

In this example: the quotation is built from the price list and the die register, the existing die saves the customer HK$650.00, and the job ticket waits for approved artwork instead of going to the press.

How we helped

We bring the printer's price list, quantity tiers, die register and artwork approvals into one system. The coordinator enters the size, material, colours, quantity and delivery date from the enquiry, and the system works out every charge, drafts the quotation and, once the customer accepts, fills in the job ticket from the same figures.

  1. Enquiry in. The coordinator enters the job details from the email or WhatsApp message; nothing about how customers ask changes.
  2. Priced by the rules. Material, plates, die, printing tier, setup and rush charge are worked out from the price list and die register.
  3. Checked, then sent. The quotation and its email are drafted; the coordinator checks them and sends them.
  4. Ticket released on approval. When the customer accepts, the job ticket is filled in, but it is only released once the approved artwork version is on file.

What the system handles

Quotations

Priced from the printer's own price list, quantity tiers and die register, with the rush surcharge applied by delivery date.

Job tickets

Material length including waste, colours, die number and finishing, taken from the accepted quotation.

Artwork control

Every artwork version is logged with its approval; only the approved version can reach production.

Die register

Dies are listed by size and number, so a new size is flagged and its die cost confirmed before quoting.

Order follow-up

Each job's status — quoted, accepted, awaiting artwork, printing, delivered — is listed for the coordinator.

Before and after

TopicBeforeAfter
PricingLabel area, material rate and quantity tier were worked out on a calculator for every enquiry.Every charge is worked out from the price list, and each quotation shows its working.
DiesThe die register was checked by hand, so a missing die could easily end up absorbed by the company.A size with no die on file is flagged, and the die charge is confirmed before quoting.
ArtworkVersions were tracked in email, so a job could be printed on an old version.Only the approved version can be attached to a job ticket.
Job ticketsFigures were retyped from the quotation, and the roll length worked out again.The job ticket is filled in from the accepted quotation, including material length with waste.
Reply timeMany quotations went out at the end of the day.A quotation draft is ready within minutes of the enquiry being entered.

How much time it saves

  • About 640 quotations a month (roughly 160 a week), each taking about 18 minutes to work out, write up and turn into a job ticket.
  • 640 quotations × 18 minutes = 11,520 minutes = 192 hours a month.
  • With the system, the coordinator checks each quotation in about 3 minutes: 640 × 3 = 1,920 minutes = 32 hours.
  • Time saved ≈ 160 hours a month — about 20 working days.
  • At HK$110 an hour (about HK$19,000 a month for one full-time clerk, MPF included), that is about HK$17,600 a month — before counting dies and reprints no longer paid for by the company.

These are the working assumptions behind the figure, not an audited result.

How a project like this runs

  1. Free assessment. We sit with your order coordinators for a week of enquiries and collect your price list, die register and twenty past quotations.
  2. Built on your own quotations. The pricing rules are rebuilt from your past quotations and tested until they reproduce the quoted figures exactly.
  3. Side by side. For two weeks your coordinators quote by hand while the system prices the same enquiries, and the two are compared line by line.
  4. Live, then maintained. Once they match, manual pricing stops. New materials, tiers and dies are added as they come, and we fix anything that comes up.

Questions owners usually ask

  • Can we still give a special price to a good customer?
    Yes. The coordinator can adjust any quotation before it is sent; the system records the change next to the standard price.
  • Our price list changes when paper prices change. Is that a problem?
    No. The price list is updated in one place, and every new quotation uses the current rates.
  • What if the customer approves artwork by WhatsApp?
    The coordinator records the approval against that artwork version, with the message attached. The job ticket is released only after that.

The results

  • Every quotation is priced from the same price list, tiers and die register, and shows how each charge was reached.
  • A missing die is flagged for confirmation before quoting.
  • Job tickets are filled in from the accepted quotation and released only on approved artwork.
PythonClaudeExcelWhatsAppEmail

Representative example — a composite of typical Hong Kong workflows, written from the duties in current job ads. Company names, documents and figures are sample data.

← Back to all case studies

Does your company have a formula like this?

Send us one real example — a quotation, an invoice or a month-end statement — and we will show you how the system would work it out. The assessment is free.

Get a free assessment →